Written Specification
Every work item, material brand, layer thickness and acceptance criterion is set out in the contract annex.
Transparent Pricing
Our square metre prices are published on this page. After the survey the quotation is itemised, with no items appearing later.
Delivery on Schedule
A standard outdoor court is completed in 18 – 30 days when the weather allows.
Nationwide Coverage
With our Ankara-based team we survey and build in all 81 provinces.
Turnkey Basketball Court Construction
Site survey, level taking, excavation and crushed stone fill, drainage, mesh-reinforced concrete slab, surface application, line marking to FIBA dimensions and installation of equipment are all done by us. Because the work runs through one party, responsibility is not divided. The most common problem on multi-contractor jobs is the surfacing contractor saying "the concrete was poured badly" and the concrete contractor saying "the surface was laid wrongly"; the one left in the middle is the client. A turnkey contract leaves no such grey area: whoever built the court also carries the warranty.
Sports Surfacing and Renewal
On courts where the existing concrete slab is sound, only the surface is replaced without renewing the substructure. After surface cleaning, crack repair and level correction, primer, filler and colour coats are applied. The decision to resurface is taken at the survey: if there is settlement, deep cracking or ponding water, a coating laid without dealing with those will separate in the same place within a year. We measure the condition of the slab and report it in writing; we do not sell resurfacing to a court where resurfacing will not be enough.
Substructure, Drainage and Concrete Slab
Compacted graded crushed stone fill, drainage pipework and gully system, mesh-reinforced C25 concrete slab and the falls set for rainwater discharge. Slabs poured without reinforcement or without fall crack in the first winter and take the surface with them. The layer that determines the life of a court is invisible at handover: if the topsoil was not fully stripped the ground settles, if the stone was not laid in stages compaction is uneven, and without drainage water collects under the slab and splits the concrete through freeze-thaw cycling. Money saved on these three items is repaid by rebuilding the whole court three years later.
Line Marking to FIBA Dimensions
Lines are marked to FIBA rules, 5 centimetres wide and in a single colour. Where more than one sport shares the surface, line colours are separated so they cannot be confused; the basketball lines always stay in the most prominent colour. The three-point arc, free-throw line and key dimensions are defined in the rules and cannot be set by eye. Before application the court is measured with a laser, the centre axis established and the layout marked on the surface; paint follows that setting out.
Basketball Goal Supply and Installation
Goals are installed with the ring at 3.05 metres and an internal diameter of 45 centimetres. Backboards are offered in tempered glass or acrylic; competition courts use a breakaway ring. The post foundation is planned together with the slab pour — a foundation opened afterwards means breaking and patching the slab. Goal type follows the use: a fixed post with a robust backboard in a school yard, a cantilever system on castors in a competition hall, an adjustable portable goal in a house garden. The safety margin between post and court line is maintained in every type.
Court Lighting Systems
Designed to 200 lux for training use and 500 lux for competition. LED floodlights of 200 – 400 W are set on four columns at angles that spread the light evenly across the court. What matters in lighting is not total wattage but even distribution: if one end of the court is bright and the other dim, players lose the ball. Floodlight angles are set so the light does not fall directly into a player's eyes. Lighting done properly doubles the daily usable hours of a court; evening hours are the only workable slot for working adults.
Perimeter Fencing, Cages and Netting
A standard installation is a 4 metre perimeter fence; it keeps the ball inside and prevents damage to neighbouring areas. Gate widths are planned so maintenance vehicles can enter. Fence height varies with the setting: on courts beside a road or car park the sections behind the baskets rise to 5 – 6 metres, while 3 metres may be enough inside an enclosed garden. Galvanised posts and panels are decisive against corrosion; painted steel rots from the base within a few winters.
Indoor Basketball Hall Construction
Structurally calculated steel frame, sandwich panel or membrane roof covering, hall lighting and ventilation infrastructure, and a timber or PVC floor. Clear ceiling height is planned at a minimum of 7 metres; in competition halls that figure is measured from the highest point of the ball, not from the ring. Two items matter as much as the floor in an indoor hall: ventilation and humidity control. In a hall without airflow, condensation reaches the floor, timber moves and PVC becomes slippery. Roof insulation, in turn, decides whether the hall is usable in summer.